Inside the new house
view from top floor
master bedroom
into the spare bedrooms on floor 3
upstairs bathroom
stairs from ground to floor 1
stairs to floor 2
Top of the stairs under the skylight
view from top floor
master bedroom
upstairs bathroom
stairs from ground to floor 1
stairs to floor 2
Finished left hand side looking over Johnsonville/Churton Park in the background.
Finished front of the house and garage door.
The finished right had side of the house.
Putting the plaster over the polystyrene cladding on the right hand side of the house. The colour will de done later.
Polystyrene cladding over the right hand side of the house. the windows have been covered with yellow tape to protect them from the plaster.